BVT Status is not shown in View Builds Records
I have manually created build records and a build definition. I have an execution schedule configured to run a single test, when the build status is OK.
Upon chaging the build status to OK, the test is run as expected. The build record is updated and shows bvt status as passed, with the number of tests passed.
The problem is, this information is not shown in the View Builds Records view. I have added these two columns, but the data is not shown.
Upon chaging the build status to OK, the test is run as expected. The build record is updated and shows bvt status as passed, with the number of tests passed.
The problem is, this information is not shown in the View Builds Records view. I have added these two columns, but the data is not shown.
One answer
Hi,
Sorry, but we had to pull that from the View Builds Records pages at the last minute due to some serious performance issues when that data was displayed. Look for it to be fixed (added back) in a follow-up 2.0 fix pack.
Sorry for the confusion.
Regards,
John
Sorry, but we had to pull that from the View Builds Records pages at the last minute due to some serious performance issues when that data was displayed. Look for it to be fixed (added back) in a follow-up 2.0 fix pack.
Sorry for the confusion.
Regards,
John
I have manually created build records and a build definition. I have an execution schedule configured to run a single test, when the build status is OK.
Upon chaging the build status to OK, the test is run as expected. The build record is updated and shows bvt status as passed, with the number of tests passed.
The problem is, this information is not shown in the View Builds Records view. I have added these two columns, but the data is not shown.