Connect an active ProjectArea to a master ProjectArea


Georg Kellner (82137392) | asked Apr 26 '13, 6:03 a.m.
RTC 4.0.2
We have started with a ProjectArea A.
After some time we've created a master project area, where we want to develop/change the process.

Is it possible to connect ProjectArea A to the master area?

greetings georg.

One answer



permanent link
Guido Schneider (3.4k1379103) | answered Apr 26 '13, 6:16 a.m.

If the ProjectArea A and the Master Area have originaly the same source and the ProjectArea A was not modified to much, this should not be a problem.

We did it with two steps:

- replace in ProjectArea A the XML part with the XML part of a ProjectArea which was created withhelp of the unconfigured process

- Inherit the ProjectArea A from the Master PA

If you have done some modifications in workitems (new fields etc.) in ProjectArea A, i suggest first to apply this changes in the Master PA 