"The Solution Backlog is the holding area for upcoming Capabilities and Solution enablers, each of which can span multiple ARTs, and are intended to advance the Solution and build its architectural runway."
Details
© Copyright IBM Corp. 1987, 2020. All Rights Reserved. Includes material reproduced with permission © 2011-2016 Scaled Agile, Inc. All rights reserved. Scaled Agile Framework® and SAFe® are registered marks of Scaled Agile, Inc.