Moving a work item from a no longer existing state


Dwayne Bullock (1132) | asked Aug 05 '08, 2:49 p.m.
One of our project managers created a customized process and switched an already existing iteration over to this new process. Now some of the work items are showing states such as .state.S3 and .state.S4. Inside of RTC the action button shows greyed out and says Unitialized. Does anyone know how I go about changing these work items from the none existing states to a state that exists in the new process.

2 answers



permanent link
Christof Marti (681) | answered Aug 08 '08, 4:28 a.m.
You can reintroduce a state with the same id and some action going to another existing state to work around this issue. I have opened https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/59667 to track this issue.

HTH,

Christof
Jazz Work Item team


icewsu2002 wrote:
One of our project managers created a customized process and switched
an already existing iteration over to this new process. Now some of
the work items are showing states such as .state.S3 and .state.S4.
Inside of RTC the action button shows greyed out and says
Unitialized. Does anyone know how I go about changing these work
items from the none existing states to a state that exists in the new
process.

permanent link
Dwayne Bullock (1132) | answered Aug 18 '08, 3:50 p.m.
I found another solution also. You can change the work items type, save it, and change it back. That will drop it into the default state for the work item.