link in predesessor type message error
i have create 2 workitem task1 and task2 and set predesessor task1 to task2.
i set estimate to 1 hour and set owned by to 1 user both of workitem. i resolve the task1 after that i resolve task2 i check the plan and found message error : Successor work item was completed before the predecessor work item. do you know why the plan say error ? Thanks teguh |
One answer
Ralph Schoon (63.1k●3●36●45)
| answered Mar 22 '12, 7:15 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER
My assumption is that having a predecessor in the plan says that this predecessor needs to be implmented before the successor. If that is not true, the predecessor link should be deleted.
|