Two versions of asset and merging
One of our user faced a strange issue on asset versions and merging of assets. When we tested even we found that it is a kind of bug. Following are the details and use-case :
1) User submits an asset abc with v1.0.
2) User moved the Draft state asset abc into As-is.
3) User modified the abc asset, change its version to 1.1 and resubmitted (asset will remain Draft).
4) Its worked as designed and RAM created 2 versions of the same asset abc with one version in As-Is state and other version in Draft state. Please note that the As-is state version is 1.0 and Draft is 1.1.
5) As designed, there were no actions (modify, delete, etc.) available for As-is state asset.
6) When user changed the state of Draft asset into As-Is, it didn't merged with its As-Is state asset and As-Is state asset got stuck in its no-actions available mode.
Please comment on the above use-case and let us know how we can delete that stuck As-is state asset.
1) User submits an asset abc with v1.0.
2) User moved the Draft state asset abc into As-is.
3) User modified the abc asset, change its version to 1.1 and resubmitted (asset will remain Draft).
4) Its worked as designed and RAM created 2 versions of the same asset abc with one version in As-Is state and other version in Draft state. Please note that the As-is state version is 1.0 and Draft is 1.1.
5) As designed, there were no actions (modify, delete, etc.) available for As-is state asset.
6) When user changed the state of Draft asset into As-Is, it didn't merged with its As-Is state asset and As-Is state asset got stuck in its no-actions available mode.
Please comment on the above use-case and let us know how we can delete that stuck As-is state asset.
12 answers
What is your definition of a new asset? You will have two assets until you move the draft asset into As-is state. Until that happens there are two assets.
So did you wind up with two assets in As-is state?
If you did, please give me access to the testcase because it shouldn't happen.
I looked at the live example you gave me and it was fine because the draft asset had not yet been moved to As-is.
So did you wind up with two assets in As-is state?
If you did, please give me access to the testcase because it shouldn't happen.
I looked at the live example you gave me and it was fine because the draft asset had not yet been moved to As-is.
I don't understand. Everything looks like it should be:
a) 1.1 is in Draft - but is based upon the 1.0 as an eventual replacement for 1.0 - there is an AS-IS action available on it.
b) 1.0 is in As-Is and is properly locked as it should be since the Draft asset was started to eventually replace it.
When you do the As-Is on the Draft asset (and this approved by the admin if needed) then the 1.0 As-Is will be replaced by the 1.1 version.
a) 1.1 is in Draft - but is based upon the 1.0 as an eventual replacement for 1.0 - there is an AS-IS action available on it.
b) 1.0 is in As-Is and is properly locked as it should be since the Draft asset was started to eventually replace it.
When you do the As-Is on the Draft asset (and this approved by the admin if needed) then the 1.0 As-Is will be replaced by the 1.1 version.
6) When user changed the state of Draft asset into As-Is, it didn't merged with its As-Is state asset and As-Is state asset got stuck in its no-actions available mode.
What was the actual process to do step 6?
After step 6 were there now two assets?
Or did the Draft asset and its contents just disappear with no changes on the As-Is asset at all?
What was the actual process to do step 6?
After step 6 were there now two assets?
Or did the Draft asset and its contents just disappear with no changes on the As-Is asset at all?