It's all about the answers!

Ask a question

Will RTC build automatically accepts from multi flow targets


Joef Huang (46114) | asked May 17 '11, 3:05 p.m.
edited Oct 26 '17, 11:36 a.m. by David Lafreniere (4.8k7)

Hello,

In build definition, we point to a build repository workspace which has 2 components and 2 flow targets:

- component A is from stream A
- component B is from stream B

The stream A is the "current" and "default" flow target.

In "Pending Changes" view, I can only see the changes from 1 flow target at a time.

I wonder if RTC build is able to automatically accepts changes from both flow targets? Or if not, how can we switch the "current" flow target during build?

Thanks.

Accepted answer


permanent link
Brent Ulbricht (2.5k11) | answered May 18 '11, 9:23 a.m.
JAZZ DEVELOPER
edited Oct 26 '17, 11:38 a.m. by David Lafreniere (4.8k7)

A build will accept from all flow targets. So when you set up the build's workspace, you will need to scope the flow targets. In the workspace editor, add streams A and B to the flow target. Select stream A and click Edit. Select component A as the only component to flow. Do the same with stream B and component B.

As Tim pointed out, it's important to not have the same component coming from multiple flow targets. The link below is a technote showing an exception you might see if you have the same component coming from multiple accept sources.

https://www-304.ibm.com/support/docview.wss?uid=swg21330758

Brent Ulbricht
Developer/Lead - RTC Build

David Lafreniere selected this answer as the correct answer

2 other answers



permanent link
Joef Huang (46114) | answered May 20 '11, 9:48 a.m.
edited Oct 26 '17, 11:34 a.m. by David Lafreniere (4.8k7)

Thanks for confirming this.

We don't have same component coming from multiple accept sources, so we should be good.

Thanks.


permanent link
Tim Mok (6.6k38) | answered May 18 '11, 8:30 a.m.
JAZZ DEVELOPER
edited Oct 26 '17, 11:34 a.m. by David Lafreniere (4.8k7)

When you set up the build's workspace, you can scope the flow targets. In the workspace editor, add streams A and B to the flow target. Select stream A and click Edit. Select component A as the only component to flow. Do the same with stream B and component B.

I believe that should get the changes from the streams that you want.