Moving children when parent is re-planned


Millard Ellingsworth (2.5k12431) | asked May 12 '08, 2:48 p.m.
FORUM ADMINISTRATOR / JAZZ DEVELOPER
I was going over my iteration plan and decided to move a Story from the current iteration back onto the Product Backlog. We had already done some planning for the story, so there were Tasks with estimates targeted for the current iteration.

When I changed the parent to be Planned For the Product Backlog, its child Tasks did not get replanned along with it. I had to go into each of them and move them to the Product Backlog.

Is this something that should work as expected (please say "yes") or can it at least be configured to work this way when using the Scrum process template?

4 answers



permanent link
Dirk Baeumer (4811) | answered May 20 '08, 8:25 a.m.
JAZZ DEVELOPER
The behavior differs depending on how you reassign the work back to the
product backlog. If you change the planned for attribute in either the
work item editor or by using the iteration plan editor's context menu
then only the parent work item is reassign. If you D&D the story back to
the product backlog all work items are reassign.

If you want to use the context menu you can always multi select and
reassign all work items at once.

Dirk Baeumer
Agile Planning Component


millarde wrote:
I was going over my iteration plan and decided to move a Story from
the current iteration back onto the Product Backlog. We had already
done some planning for the story, so there were Tasks with estimates
targeted for the current iteration.

When I changed the parent to be Planned For the Product Backlog, its
child Tasks did not get replanned along with it. I had to go into
each of them and move them to the Product Backlog.

Is this something that should work as expected (please say
"yes") or can it at least be configured to work this way
when using the Scrum process template?

permanent link
Maren Nelson (611611) | answered Aug 01 '08, 1:52 p.m.
Sorry to be dense here... but I'm having trouble figuring out where to drag FROM and where to drop TO. Am I dragging from the iteration plan "Planned Items" tab? Am I dropping on the Team Artifacts tab (this combo isn't working by the way :-)

permanent link
Millard Ellingsworth (2.5k12431) | answered Aug 01 '08, 1:59 p.m.
FORUM ADMINISTRATOR / JAZZ DEVELOPER
You need to configure your workspace so that both plans are visible. I'll try to describe, though there is nothing like seeing it happen.

Open both plans in the editor. Click and hold one of the tabs and drag it towards the bottom of the window. When you near the bottom, you should see a large rectangle appear that indicates where it will put the tab if you let it go. Let it go. Now both plans should be visible, one in the top half, one in the bottom half of the editor area.

permanent link
Maren Nelson (611611) | answered Aug 01 '08, 3:13 p.m.
Your instructions worked perfectly! Thanks!