How to run Delta Load since a specified date in Insight
![]()
In IBM Rational Insight integrated with IBM Rational Collaborative Lifecycle Management (CLM) solution, I want to run a Delta Load since a specified date.
How can I run Delta Load since a specified date in Insight? |
One answer
![]()
To run a Delta Load since a specific date, you need to modify the Prepare script inside the respective JobStream.
You can see the example for IBM Rational Team Concert 5.0 Work Item Delta Load below. To run a Delta Load since a specified date:
|