Is it possible to link a pre-requisite test case to a test for execution?
Hi, There is option in HP QC where you can call the one test from another.The called Test case will be executed first and status of called test case will be updated in design step. If you click on any test case , On the right hand side window select the design tests tab and you will see an option call to test(Ctrl + L) . Here you can link another test case.
But where could I find the same option in RQM ?
|
2 answers
You can call test scripts using Keywords (reusable test script building blocks) within a test script. Otherwise, the consecutive execution of test cases can only be achieved via test suites as Taly already mentioned. Please note the distinction between test script and test case.
|
I'm not familiar with HPQC, but from your description I believe what you wish would be done in RQM by setting a Test Suite and indicating that tests within the Suite should be run sequentially.
Comments
Mahesh Jayaramaiah
commented Sep 04 '14, 12:50 a.m.
ok but here my problem is i want to execute particular test case in between an step of another test case
Taly Hotimsky
commented Sep 04 '14, 12:58 a.m.
I'm not sure why you'd want to do that.
For reusable steps (which maybe is what you're looking for) there's a feature in RQM called "Keywords" where you can reference a set of steps in multiple Test Scripts (which, in turn, are associated to the Test Cases).
If you're really looking to, as a step of a Test Case, reference another whole TC, I'm not sure that it's either wise (from a methodology perspective) nor that it could be done in RQM.
|