RTC 4.0.1 Cost Attributes
![]() I would like to add a cost attribute into a custom work item.. What attributes type and configuration do I need to set for a Cost Attributes? * I notice that in the FPM process the Risk work item includes consequence cost - I do not have the process template for this type. I guess I would need to same settings. Thanks. |
2 answers
![]()
For FPM, the Consequence Cost is of type long, and in the editor presentations the kind is Risk Cost. You can create a custom attribute in a seperate project area with the same configuration.
Comments Hi, I've got access to the FPM process: do you know why it's a Long Type rather than an Integer? Does anyone have a link to the Attribtue list in RTC - I've seen a document which explains each attributes etc. Thanks Do you mean this list?
|
![]() So is it possible to confirm the follwing: Integar is :
Long is: −2,147,483,648 to +2,147,483,647 |