IBM Rhapsody Model Manager

Analysis Design change management Lifecycle traceability

IBM Engineering Systems Design Rhapsody - Model Manager 7.0.2

Product Release / Trial | December 11, 2020

Upgrade

If you are upgrading from version 7.0 or earlier, after you upgrade your server to 7.0.2 you must obtain updated licenses from the IBM License Key Center to replace your current licenses. If you previously used floating, token, or authorized user single install licenses, install their updated versions. Your existing user license assignments are kept during the installation of the updated licenses. To update your current license files, follow the instructions in the Interactive Upgrade Guide.

Migration

Starting in 6.0.6, you can migrate Rhapsody models and OSLC links from Design Management to Rhapsody Model Manager. When you migrate the model, you can choose whether or not to import the included OSLC links. If you decide not to import the OSLC links, you can import them into the new model at a later time. You can also import only the OSLC links, without the model. Use this method for externally managed projects.