IBM Rational Team Concert
Task tracking · Source control · Agile planning
Rational Team Concert 3.0.1.6 interim fix 3
Rational Team Concert 3.0.1.6 interim fix 3 Release Notes
This interim fix is a service release of Rational Team Concert, Version 3.0.1. For information about documentation and support resources, software and hardware requirements, and installation or upgrade steps, see the Getting Started page.
Use the queries below to see the important fixes and issues in the release. You can also read the Jazz Foundation 3.0.1.6 interim fix 3 Release Notes, the Rational Requirements Composer 3.0.1.6 interim fix 3 Release Notes, and the Rational Quality Manager 3.0.1.6 interim fix 3 Release Notes.
Fixes in this release
This release includes APAR and non-APAR defect fixes.
For a detailed list that includes all fixes for this release, view this work item query.
For a list of APARs that are fixed in this release, see the Rational Team Concert APARs fixed in this release work item query.
The following APARs are fixed in this release:
APAR | Summary | Work Item |
---|---|---|
PM77958 | [Backport to 3.0.1.6 iFix3] APAR PM77958 Defect 241302 - Build property changes causing full dependency analysis unnecessarily | 302156 |
PI17023 | [backport to RTC 3.0.1.6 ifix3] APAR PI17023 [Defect 265606] Reportable REST API should handle non resolvable enumerations | 311060 |
PI14339 | [backport to RTC 3.0.1.6] [wi 308903]Screen capture security exception running on Oracle Java 7 u51 and above | 311265 |
Known Issues in 3.0.1.6 interim fix 3
3.0.1.6 interim fix 3 includes Installation Manager (IM) version 1.5.3
If you are using the 3.0.1.6 interim fix 3 product launchpad on systems with newer versions of Installation Manager installed, it might be necessary to apply steps from
Workaround: IBM Installation Manager installed
on machine is incompatible with the version included in Jazz downloads.