Rational Quality Manager 3.5 M3 Milestone

Early Access Milestone | October 3, 2011
This is not the recommended version. We recommend Rational Quality Manager 4.0. This is made available for archival purposes and may contain bugs and/or security vulnerabilities. If you do download this version, it is being provided AS IS, without warranties of any kind, including the implied warranties of merchantability and fitness for a particular purpose. We strongly advise you review the support pages for this version and update the product or take actions recommended therein. Security bulletins contain instructions for the security vulnerability addressed therein, and may require upgrading to a newer version. Link to security vulnerability blog: IBM PSIRT blog.

The downloads for this milestone are no longer available.

Rational Quality Manager 3.5 M1 New & Noteworthy

Rational Quality Manager 3.5 M3 "New and Noteworthy"

Here are some of the most noteworthy items in Rational Quality Manager 3.5 M3. In addition, this milestone includes any new features that were added for Rational Quality Manager 3.0.1.1.

Table of contents

Traceability and live views
Requirements: DOORS/RQM integration using OSLC
CVS export of table data
Test execution
General UI improvements
Improvements to the RQM Reportable REST API

Also included are descriptions of the new features in the previous milestones. See New & Noteworthy in RQM 3.5 M1


Traceability and live views

In the "View Test Plans" list, there is a new "View As" action that lets you show different result sets. In addition to the "General" view, there is now a "Traceability" view that shows the CLM links related to each test plan. From the link columns, you can also associate CLM links directly to the test plan. For more details, see [QM] RQM traceability and live views - M2 story: Pilot implementation of a traceability aspect view for test plan list view (54373).


Requirements: DOORS/RQM integration using OSLC

In M3, you can integrate DOORS and RQM using OSLC. To set this up, do the following:

  1. Add DOORS as a friend in the Jazz Team Server Administration page.
  2. Add DOORS as the Requirements Management (RM) provider for the RQM project.
  3. Associate an RQM test plan with the DOORS requirement view.
  4. Add a bi-directional link between an RQM test case and a DOORS requirement.

For more details, see [QM] RQM/Doors Integration - bi-directional link between RQM and Doors (54712).


CSV Export of data in table views

It is now possible to export data in the following table views to CSV format, where the data can later be reused; Test Plans, Test Cases, Test Scripts, Test Suites, Test Case Execution Records, Test Suite Execution Records, Test Case Results, and Test Suite Results. See CSV Export for table view data.


Test execution


General UI improvements


Improvements to the RQM Reportable REST API


New & Noteworthy in RQM 3.5 M1

Improved requirements capabilities

  • Rich hovers are now provided for Rational RequisitePro requirements. The rich hover shows all of the information that is provided by RequisitePro, including the RequisitePro project, the content (tag, name, text, package, and so on), and a link to the RequisitePro requirement or view.

    Rich hovers for RequisitePro

  • Integrated RequisitePro requirements can now be migrated to Rational Requirements Composer.
  • The user experience has been improved for reconciling requirement suspect status.
  • It is now possible to exclude specific requirements from migration to Rational Requirements Composer.
  • Improvements have been made to the DOORS integration.

Improvements to the RQM Reportable REST API


Performance improvements

Both the Adapter and Execution consoles now support paging.


Execution enhancements

The following new options are now available for weight and verdict roll-up when modifying test case results that are part of a test suite result:

  • You can now set the Update Test Suite Result points and verdict when Test Case Result is modified execution preference to control whether or not the verdict and weight changes in a test case result are automatically rolled-up to the test suite result.
  • From a test suite result, you can click the Calculate weight icon to update the weight of a test suite result to reflect the weights of the test case execution results created during test suite execution.
  • Test case results now include a Related Suite Result panel.

You can now link test suite results to build records.

Users are now required to enter values for required custom attributes before closing manual script execution results.


Automatic unblocking of test case execution records when a ClearQuest defect is resolved

The Rational Quality Manager integration with ClearQuest now supports automatic unblocking of test case execution records when a blocking ClearQuest defect is resolved. When you configure automatic unblocking, the change management integration service runs at a selected interval and checks for blocking defects that have been resolved. To use this feature, you must be using ClearQuest version 7.1.2.2 or later with the OSLCLinks package version 1.2. Follow these instructions to configure the change management integration service:

  1. Click Admin > Manage Application.
  2. Under Configuration, click the Advanced Properties section.
  3. Scroll to the RQM Change Management Integration section and click Edit.
  4. Enter a user name and password for ClearQuest.
  5. For Delay, type a value, in seconds, for the interval at which you want the change management integration service to run. The default value is 500 seconds.