Rational Quality Manager and Rational Test Lab Manager 2.0 Trial Version
July 29, 2009 | Learn about the project | Documentation
Rational Quality Manager and Rational Test Lab Manager 2.0 - New and Noteworthy
This is a summary of the main new features and improvements in the 2.0 release of Rational Quality Manager. In addition, this release adopts the 2.0 release of the common server architecture that Rational Quality Manager shares with IBM Rational Team Concert. (June 25, 2009).
Contents:
- Collaborative ALM
- Rational Team Concert Defect Integration
- Rational Team Concert Build Integration
- Rational Team Concert Work Item Previews
- Advanced and Customized reporting
- Risk Based Testing
- Hierarchical views
- Integrated print function
- Productivity enhancements
- Enhanced Editing of Manual Tests
- Enhanced Execution of Manual Tests
- Rational DOORS integration
- Catalog customization
| Collaborative ALM | Rational Quality Manager 2.0 participates in the Collaborative Application Lifecycle Management (C/ALM) effort which, initially, provides integrations among Rational Team Concert, Rational Quality Manager, Rational Requirements Composer, and ClearQuest. |
| Rational Team Concert Defect Integration | The ability to open defects directly on a Rational Team Concert server now allows developers and testers to better collaborate and work on the same work items. |
| Rational Team Concert Build Integration | It is now possible for Rational Team Concert to notify Rational Quality Manager when a build is complete and then initiate a Build Verification Test (BVT). Execution schedules can then run sequences of Test Suites, Test Execution Records and Automations to ensure build quality. |
| Rational Team Concert Work Item Previews | When a tester working in Rational Quality Manager hovers over a cross-server link to a Rational Team Concert work item, the work item preview is shown in a rich hover. This allows the tester to quickly inspect the status of the work item without having to leave the Rational Quality Manager context. |
| Advanced and Customized reporting | Previously Rational Quality Manager relied upon the Eclipse BIRT reporting engine. IBM Rational Quality Manager is now integrated with an advanced and customizable reporting engine based on Cognos technology that addresses the concerns and needs of business analysts and management. This integration supplies over 50 out of the box reports that leverage built in ROI metrics for test lab and test assets in compliance with IBM's Measured Capability Improvement Framework (MCIF). |
| Risk Based Testing | IBM Rational Quality Manager's Risk Based Testing enables teams to confidently make decisions to meet business quality objectives supporting best practices in risk management. By prioritizing efforts to assure quality where resources are limited and providing a collaborative risk management strategy, teams are able to focus on those areas of the application which are at the highest risk of failure. |
| Hierarchical views | You now have the ability to view Test Plans, Test Cases, Test Scripts and other artifacts in a hierarchical organization using two new views. |
| Integrated print function | For those needing to print artifacts to hard copy, you now have the ability to print to easy to read PDF formats. |
| Productivity Enhancements | Rational Quality Manager 2.0 includes several new functions to improve productivity including new keyboard shortcuts and the ability to jump start the creation of Test Scripts from your existing Test Cases. Automatically create and associate test cases from your requirements. Custom grid control support section in the Test Plan adds flexibility to your plans. Define new and add existing Quality Objectives to your Test Plans to monitor progress through the automatic calculation of those Quality Objectives to plan. |
| Enhanced Editing of Manual Tests | The editing capability for Manual Testing has been enhanced by the addition of "Expected Results" and improved image attachment management. Additionally, you now have the ability to create keywords from within the script, and the Keyword View can be collapsed. |
| Enhanced Execution of Manual Tests | We have also added execution enhancements for Manual Testing with the addition of "Expected Results" and "Actual Results", as well as Toolbar enhancements to reduce the number of clicks and correct situations where the scrollbar would scroll out of view. Rounding out the execution enhancements, steps within keywords will execute as separate steps. |
| Rational DOORS Integration | IBM Rational Quality Manager can now track requirements through a dynamic link to Rational DOORS. Test cases can be linked to requirements, providing project managers with a way to track requirements coverage as well requirements change impact on quality plans. |
| Catalog customization | You can now customize the catalog by adding or hiding lab resource attributes. |
© Copyright 2009 IBM Corporation






