Skip to main content
Jazz Community SiteJazz Community SiteDownloadsDownloads

Rational Quality Manager and Rational Test Lab Manager 2.0 Trial Version

July 29, 2009 | Learn about the project | Documentation

This is not the most recent version. We recommend Rational Quality Manager and Rational Test Lab Manager 2.0.1 iFix 3
Rational Quality Manager and Rational Test Lab Manager 2.0 News

Rational Quality Manager and Rational Test Lab Manager 2.0 - New and Noteworthy

This is a summary of the main new features and improvements in the 2.0 release of Rational Quality Manager. In addition, this release adopts the 2.0 release of the common server architecture that Rational Quality Manager shares with IBM Rational Team Concert. (June 25, 2009).

Contents:


Collaborative ALM

Rational Quality Manager 2.0 participates in the Collaborative Application Lifecycle Management (C/ALM) effort which, initially, provides integrations among Rational Team Concert, Rational Quality Manager, Rational Requirements Composer, and ClearQuest.


Rational Team Concert Defect Integration

The ability to open defects directly on a Rational Team Concert server now allows developers and testers to better collaborate and work on the same work items.

Rational Team Concert Defect Integration
Click for full size image


Rational Team Concert Build Integration

It is now possible for Rational Team Concert to notify Rational Quality Manager when a build is complete and then initiate a Build Verification Test (BVT). Execution schedules can then run sequences of Test Suites, Test Execution Records and Automations to ensure build quality.

Rational Team Concert Build Integration
Click for full size image


Rational Team Concert Work Item Previews

When a tester working in Rational Quality Manager hovers over a cross-server link to a Rational Team Concert work item, the work item preview is shown in a rich hover. This allows the tester to quickly inspect the status of the work item without having to leave the Rational Quality Manager context.

Rational Team Concert Work Item Previews


Advanced and Customized reporting

Previously Rational Quality Manager relied upon the Eclipse BIRT reporting engine. IBM Rational Quality Manager is now integrated with an advanced and customizable reporting engine based on Cognos technology that addresses the concerns and needs of business analysts and management. This integration supplies over 50 out of the box reports that leverage built in ROI metrics for test lab and test assets in compliance with IBM's Measured Capability Improvement Framework (MCIF).


Risk Based Testing

IBM Rational Quality Manager's Risk Based Testing enables teams to confidently make decisions to meet business quality objectives supporting best practices in risk management. By prioritizing efforts to assure quality where resources are limited and providing a collaborative risk management strategy, teams are able to focus on those areas of the application which are at the highest risk of failure.

Risk Based Testing
Click for full size image

Risk Based Testing
Click for full size image


Hierarchical views

You now have the ability to view Test Plans, Test Cases, Test Scripts and other artifacts in a hierarchical organization using two new views.

Tree Views
Click for full size image

Explorer View
Click for full size image


Integrated print function

For those needing to print artifacts to hard copy, you now have the ability to print to easy to read PDF formats.

Integrated print function
Click for full size image

Integrated print function
Click for full size image


Productivity Enhancements

Rational Quality Manager 2.0 includes several new functions to improve productivity including new keyboard shortcuts and the ability to jump start the creation of Test Scripts from your existing Test Cases.

Automatically create and associate test cases from your requirements.

Associate Test cases from requirements
Click for full size image

Custom grid control support section in the Test Plan adds flexibility to your plans.

Custom grid control support
Click for full size image

Define new and add existing Quality Objectives to your Test Plans to monitor progress through the automatic calculation of those Quality Objectives to plan.

Quality Objectives
Click for full size image

Quality Objectives
Click for full size image


Enhanced Editing of Manual Tests

The editing capability for Manual Testing has been enhanced by the addition of "Expected Results" and improved image attachment management. Additionally, you now have the ability to create keywords from within the script, and the Keyword View can be collapsed.

Manual Editing
Click for full size image


Enhanced Execution of Manual Tests

We have also added execution enhancements for Manual Testing with the addition of "Expected Results" and "Actual Results", as well as Toolbar enhancements to reduce the number of clicks and correct situations where the scrollbar would scroll out of view. Rounding out the execution enhancements, steps within keywords will execute as separate steps.

Manual Execution
Click for full size image


Rational DOORS Integration

IBM Rational Quality Manager can now track requirements through a dynamic link to Rational DOORS. Test cases can be linked to requirements, providing project managers with a way to track requirements coverage as well requirements change impact on quality plans.

Rational DOORS integration
Click for full size image

Rational DOORS integration
Click for full size image


Catalog customization

You can now customize the catalog by adding or hiding lab resource attributes.

Catalog customization
Click for full size image


© Copyright 2009 IBM Corporation