Multi-Component Technology Preview (IBM Engineering Test Management (ETM)) 7.0.2
Product Release / Trial
|
November 3, 2020
Verification Instructions
For instructions on verifying the integrity of your IBM Engineering Lifecycle Management downloads, click here .
|
The Multi-component Technology Preview enables test artifact relationships, such as linking and running tests across components in a configuration management enabled project area. This feature is currently a technology preview, which means it is an early release that is not supported for use in a production environment and only available with this download. Instructions:
|
||||
|
Description
|
Platform
|
Verify Download
|
||
|---|---|---|---|---|
| Multi-Component Technology Preview (IBM Engineering Test Management (ETM)) | All (421.03 KB) | |||